“Installation of Proofex
membrane and waterstop to 2
kilometres of cold joints and
Sika Swell & profile to 7
kilometres of steel and
concrete piling”

LEVEL
CROSSING
REMOVAL

John Holland logo

Client:

John Holland.

Method:

Water Bar and Proofex Subgrade Water Proofing.

Case:

To seal and waterproof expansion joints and construction joints below the base slabs and between pile walls and base slabs.

Implementation:

CPR Services was engaged to install 7000m of Sika Swell and 2000m of Proofex and Back Stop Waterbar to both Bentleigh and McKinnon Stations on behalf of John Holland for Metro Trains. This was achieved in a 10-day window as part of a greater 37-day greater occupation. CPR had 24 men onsite on 12-hour rolling shifts, 24 hours per day. CPR
achieved our outcome on time.

OUR CLIENTS

LEADERS IN
CONCRETE
PROTECTION
AND REPAIR

Our Location

VICTORIA (HEAD OFFICE):
24/94-102 Keys Road
Cheltenham VIC 3192
PHONE: 1300 678 725

NEW SOUTH WALES:
3/105 Derby Street
Silverwater NSW 2128
PHONE: 1300 581 228

Follow us