STRATHFILLAN BRIDGE

Client: VLINE.
Case: Repair of extensively cracked concrete abutments and piers at Strathfillan Creek Railway Bridge.
Implementation: The implementation os this project required installation of:

  • Over 1200kgs Epoxy resin injection for structural crack repair.
  • 186 lineal metres Carbon Fibre Plates into concrete internally for structural integrity to the railway bridge.
  • 270 m²Carbon Fibre wrap around piers.
  • 292 m² Anti-carbonation protective coating.

    CPR now accepting all projects

    (Maximum 10 MB per submission)